When ordinary stem packing leakage could create environmental, safety, or product-loss risks, buyers need proof that a valve’s sealing has actually been qualified—not just a supplier claim. API 624 fugitive emissions testing gives that evidence for assembled rising-stem valves by putting the complete valve and graphite packing system through mechanical and thermal cycling. Use it when procurement teams must confirm the valve design and packing were qualified together, rather than accepting that an individual packing material passed a separate test.
Why API 624 Fugitive Emissions Testing Matters to Valve Buyers
API 624 addresses type testing of rising-stem and rising-and-rotating-stem valves equipped with flexible graphite packing. Typical candidates include gate and globe valve designs used in refinery, chemical, oil and gas, and other process services where stem leakage must be controlled.
The standard evaluates the assembled valve because emission performance depends on more than packing composition. Stem finish, stem alignment, packing chamber dimensions, gland loading, temperature, and repeated operation all affect leakage. Buyers should therefore ask whether the offered valve configuration falls within a documented qualification scope rather than accepting a statement that the supplier uses “API 624 packing.”
API 624 is also different from ordinary pressure testing. An API 598 valve inspection and testing program addresses pressure-boundary and seat performance, but it does not substitute for fugitive-emission type testing.
- Engineering teams: use the qualification to support emission-control specifications and valve data sheets.
- EPC contractors: compare offered valve designs against project-approved standards and documentation requirements.
- Procurement teams: prevent non-comparable bids based only on generic low-emission claims.
- Plant operators: review packing maintenance, gland adjustment, and replacement-part controls over the valve lifecycle.
Confirm That the Offered Rising-Stem Valve Is Within Scope
A test certificate or report should be connected to the valve being purchased. Buyers should compare the tested design with the offered valve type, pressure class, size, stem diameter, body and bonnet arrangement, packing system, temperature range, and operating method. A report for one configuration should not automatically be assumed to cover every size, class, material, or stem geometry.
Start by recording the exact edition of API 624 invoked by the purchase specification. Common API 624 programs use methane as the test medium, a defined leakage limit commonly expressed in parts per million by volume, and a sequence of mechanical and thermal cycles. Requirements such as cycle count, temperature exposure, measurement method, and permitted packing adjustments must be read from the contractually specified edition.
Buyers deciding whether the valve mechanism is actually within scope can first review the functional differences between rising-stem and non-rising-stem gate valves. Quarter-turn valves normally fall under a different fugitive-emission qualification standard.

Questions for the technical deviation list
- Is the offered design rising-stem or rising-and-rotating-stem?
- Is the offered flexible graphite packing covered by the required API 622 test evidence?
- What tested valve identifies the qualification basis?
- Which offered sizes, classes, materials, and temperature ranges are represented?
- Were gland adjustments made during testing, and were they allowed by the invoked edition?
- Does actuation introduce stem side load, speed, or cycling conditions not represented by the test?
Read the Test Report, Not Just the Compliance Statement
A useful qualification package should let an engineer trace the result to a specific test valve and test procedure. Ask for sufficient report detail to review methane concentration readings, mechanical cycles, thermal cycles, temperatures, packing adjustments, test interruptions, and final condition. API 624 commonly uses a 100 ppmv maximum acceptance criterion, but buyers should verify the requirement and measurement basis in the specified edition and project documents.
Also check whether readings remained acceptable throughout the sequence rather than only at the beginning and end. A report should identify the test medium and detection method. Methane and helium results are not directly interchangeable because their measurement methods and leakage units may differ; the comparison of helium and methane valve emission testing explains why the gas and acceptance basis must appear in the RFQ.
Buyer rule: treat a packing certificate, valve pressure-test certificate, and assembled-valve fugitive-emission qualification as three different documents. One should not be used as an unsupported replacement for another.
How Packing Design and Actuation Affect Emission Control
Graphite packing performance depends on controlled compression and compatible hardware. Confirm packing manufacturer and designation where required, number and arrangement of rings, corrosion inhibitor requirements, gland and follower materials, stem hardness and finish, packing chamber dimensions, and live-loading details if used.
API 622 qualifies process-valve packing, while API 624 qualifies the assembled rising-stem valve. API 624 calls for packing previously tested in accordance with API 622, so request both the packing evidence and the valve-assembly qualification report. Packing qualification alone does not establish API 624 compliance. Where live loading is offered, buyers should review the intended function and maintenance instructions rather than assume springs eliminate inspection; this overview of live-loaded valve packing systems provides additional selection context.
Actuator selection also matters. Record whether operation is manual, pneumatic, electric, or hydraulic, then confirm required thrust, travel, cycle frequency, fail action, stem coupling, and mounting alignment. Excessive actuator thrust or misalignment can damage packing, score the stem, or create side loading even when the original valve design passed qualification.
If you are comparing rising-stem valve configurations, share the service medium, pressure, temperature, size, materials, applicable standards, actuator duty, and leakage requirements with JH Valve / Janhen Valve for a technical requirement review. The purpose of this review should be to identify missing data and qualification boundaries before a commercial quote is treated as compliant.
Build a Comparable API 624 Valve Bid Table
Do not compare bids by valve size and price alone. Use a line-by-line compliance table and require suppliers to identify exceptions. The following fields expose many of the differences that affect qualification, installation, and lifecycle performance.
| RFQ field | What the buyer should confirm | Risk if omitted |
|---|---|---|
| Valve type and pattern | Gate, globe, or other rising-stem design; stem movement and bonnet construction | A qualification for a different valve mechanism may be cited |
| Size and pressure class | NPS/DN, class or PN, bore, wall and project rating requirements | Offered configuration may fall outside documented coverage |
| Body, bonnet, and trim | Material grades, stem material, hardfacing, and corrosion allowance where applicable | Material or geometry changes may alter the qualified assembly |
| Packing and seals | Graphite packing identification, arrangement, gland hardware, gaskets, and live loading | Production packing may differ from the tested packing |
| Process conditions | Fluid composition, design and operating pressure, minimum and maximum temperature | Emission qualification may be unsuitable for actual service |
| End connection | Flanged, butt-weld, or other ends; facing, schedule, dimensions, and mating standard | Installation mismatch or unplanned field modification |
| Operasyon | Manual or actuated duty, thrust, travel, cycle frequency, fail position, and accessories | Incorrect loading can shorten stem-seal life |
| Standartlar | API 624 edition plus valve design, dimensions, pressure testing, and project specifications | “API valve” can be interpreted too broadly |
| Inspection and documents | Qualification report, drawings, material records, pressure-test records, and inspection plan | Compliance cannot be verified before release |
| Spares and maintenance | Approved packing kit, installation procedure, gland adjustment limits, and storage requirements | Uncontrolled replacement parts may invalidate performance assumptions |
Product standards and fugitive-emission qualification serve different purposes. The API 641 quarter-turn valve qualification guide explains the separate emissions test used for ball, butterfly, and plug valve assemblies. Do not substitute that evidence for the required API 624 rising-stem valve qualification.
Inspection Documents That Should Follow the Purchase Order
API 624 is generally a design qualification test, not necessarily a fugitive-emission test performed on every production valve. The purchase order should distinguish qualification evidence from routine production inspection and any project-specific witness or additional testing.

Prepare an inspection and document plan covering the following items:
- Qualification evidence: request the report reference, tested configuration, standard edition, test medium, results, adjustments, and applicable range.
- Drawing review: check valve dimensions, stem and packing chamber details where contractually required, end connections, flow direction, actuator orientation, and access for gland maintenance.
- Material traceability: define which pressure-containing and trim components require material records and how identification must be maintained.
- Production testing: state the required shell, seat, backseat, functional, and any supplementary examinations, including acceptance standards and witness points.
- Final documentation: request approved drawings, bills of material where agreed, inspection records, operating instructions, packing maintenance guidance, and spare-parts identification.
- Preservation and delivery: confirm end protection, actuator support, storage precautions, tagging, document submission timing, and shipment coordination.
For a hypothetical project with several valve classes, the buyer may use one qualification matrix per design family and map each purchase-order line to a supporting report. Any unmapped line becomes a clarification item before approval, not after delivery.
Specification Errors That Commonly Create False Equivalence
- Writing only “low-emission valve”: name API 624, its edition, the required report, and project acceptance conditions.
- Accepting API 622 alone: packing qualification does not by itself establish assembled-valve qualification.
- Ignoring qualification boundaries: verify that size, class, stem diameter, materials, packing, and temperature are represented.
- Mixing methane and helium criteria: state the test gas, measurement method, units, and acceptance limit.
- Assuming API 598 covers emissions: retain separate pressure-testing and fugitive-emission requirements.
- Changing packing after approval: require technical review before substituting packing, stems, gland parts, or live-loading components.
- Overlooking field maintenance: specify access around the gland, adjustment instructions, approved spares, and technician training needs.
- Using an incomplete actuator data sheet: confirm thrust limits, travel stops, alignment, cycling duty, and environmental conditions.
A quotation that says “designed to API 624” without identifying a test report, standard edition, tested valve, or qualification range is not yet technically comparable. Record it as an open deviation and ask for documentary clarification.
Before Approving the Rising-Stem Valve Package
Send a complete inquiry containing valve type, quantity, size, pressure class, body and trim materials, packing requirements, end connections, process fluid, design pressure and temperature, operating cycles, actuator data, standards, inspection points, documentation, spares, and delivery destination. Attach the project valve data sheet and specify whether documents require review before manufacturing or shipment.
Contact JH Valve / Janhen Valve with your completed valve schedule and API 624 requirements to request a configuration and documentation review. Ask for all deviations to be identified in writing so engineering and procurement can compare the proposed valve against the same technical baseline before order placement.
SSS
Does API 624 apply to every industrial valve?
No. API 624 addresses qualifying rising-stem and rising-and-rotating-stem valves equipped with flexible graphite packing. Quarter-turn valves and other designs may require different standards, so buyers should confirm scope before specifying it.
Is API 622 packing enough to claim API 624 compliance?
No. API 622 evaluates packing, while API 624 evaluates the packing installed in an assembled valve. Buyers should request evidence for the offered valve design rather than relying only on a packing qualification.
Is API 624 testing required on every production valve?
API 624 is generally used as a valve design type test. Routine production inspection and any project-specific fugitive-emission testing must be stated separately in the purchase order and inspection plan.
What leakage limit is associated with API 624?
API 624 commonly uses a maximum methane concentration of 100 ppmv during the prescribed test sequence. Buyers should verify the exact limit, method, and adjustment rules in the specified edition and project documents.
What should an API 624 qualification report identify?
It should identify the tested valve, packing system, standard edition, test medium, temperatures, mechanical and thermal cycles, leakage readings, adjustments, interruptions, and final result, with enough detail to assess whether the offered valve is covered.
Final Thoughts
API 624 should be treated as documented design qualification, not as a generic packing label or substitute for production pressure testing. Buyers reduce risk by defining the applicable edition, mapping every offered valve to qualification evidence, controlling packing substitutions, and carrying maintenance requirements into the operating documentation.